Defined scope. Defined responsibilities.
Choose the engagement appropriate to your project stage, with deliverables, performance criteria and responsibilities agreed before work begins.
You choose the boundary.
Every engagement is defined by an explicit contractual boundary around what Elastia delivers, what it is responsible for, and what remains with you or your engineering partners. Three standard shapes, each with a different commercial and liability structure — and you do not have to wait for a finished product to start.
Funded design study
A paid research collaboration that tests candidate membrane and adsorbent configurations against your actual operating conditions.
Separation media & modules
Membrane fibres, adsorbent material or assembled modules supplied against agreed criteria.
Pilot systems
A demonstration unit on your site under a pilot agreement, with responsibilities allocated between the parties.
| Route | Best suited to | Elastia delivers | You provide |
|---|---|---|---|
| Design study | A new or uncertain separation duty | Testing, results and a recommended next step | Process data and a funded study |
| Media or modules | A defined specification | Fibres, adsorbent or modules against agreed criteria | System integration and operation |
| Pilot system | An application requiring site validation | Pilot design and coordinated delivery | Site access, utilities and shared pilot responsibilities |
Every route starts from your gas stream, not our catalogue.
Feed-specific
Assessed against your actual gas composition and operating environment.
Technology-flexible
Membrane, adsorbent and hybrid routes evaluated rather than forcing one process.
Scalable engagement
Begin with material samples and progress through modules, pilots and engineered solutions.
Clearly defined scope
Performance targets, validation requirements and responsibilities agreed per project.
What we can do together now.
Maturity differs by application. This is where each one stands today.
| Application | Study | Samples or modules | Pilot collaboration |
|---|---|---|---|
| Biomethane upgrading | Available | Available for evaluation | Case by case |
| Custom gas separation | Available | Following laboratory qualification | Case by case |
| Post-combustion capture | Available | Development collaboration | Seeking host partners |
| Adsorbent and hybrid systems | Available | Development collaboration | Selected collaborations |
Turning a verified reduction into reportable value.
Performance monitoring and reporting
We can monitor operating conditions and separation performance, identify deviation from the design envelope and support auditable environmental reporting. Reporting outputs depend on the methodology, organisational boundary and independent verification that apply to your project.
CO₂ utilisation and offtake assessment
Captured CO₂ may have downstream value. Where purity, scale, location and market demand align, utilisation or offtake can improve project economics. We consider credible local routes during project assessment rather than after commissioning.
- 01
Operating data
- 02
Calculation and quality control
- 03
Independent verification
- 04
Approved reporting output
Where applicable: EPD input data, corporate reporting, or a certificate or credit programme.
Where separated CO₂ can go.
Which routes are viable at a given site depends on CO₂ purity, offtake distance and local demand.
Is there a credible separation route for your gas stream?
Share the composition, flow, pressure, temperature, contaminants and target purity where known. We will assess whether a material test, module evaluation or pilot study is the right next step.
UCL East Marshgate
7 Sidings Street, Stratford
London E20 2AE, United Kingdom
Share the application and whatever operating information is available. We will recommend the most appropriate study, evaluation or pilot route. An NDA can be put in place before any detailed operating data is shared.